PROJECT 1
EXPERIENCING CONSTRUCTION
ELMINA Valley phase 2 by SIME DARBY ELMINA DEVELOPMENT
Group Member CHIN MAN CHOONG JORDAN TOK WEN XUAN LAW ZHI CHANG POH WENG CHUAN SEE WEN HAN TAN YANG
Tasks of Project
For this project, we need to form a group in 6 members and we are required to select an ongoing construction site which visibly demonstrates most of the subject topics covered in the syllabus. The selected site should be medium rise or low rise building, we can choose commercial building, bungalow, terrace houses or maximum 4-storey building.
Besides, we need to identify the different types of building element and its construction process, details and materials. Specifically, we should be able to show and apply the knowledge in the details of the building construction drawing that we are to compile and reflect our understanding of construction itself.
PROJECT 2
Construction Detail and Specification
Precinct 3c by CH & I Architecture Sdn. Bhd.

Tasks of Project
This project emphasizes on proposing details for certain sections of a building, both structural and architectural detailing. We need to find and analyse the construction of a 2-storey or 3-storey residential building where we need to identify and propose only two (2) construction details for the selected elements of the building which are Wall, Door, Window, Slab, Staircase and Roof.
The construction method must consist use of either timber, steel, concrete or composite material shown in the section and details of the drawings. We need to draw the building manually and no computer aided drawings will be accepted.
REFLECTION

Building Construction I helped me to learn a lot of things, it gave me a platform to show my passion. Besides, it gave me a chance to communicate and discuss about the information of construction method with my tutor.